The LoC’s collection of drawings and histories for historic buildings in Charlottesville. #
VDOT has a bridge planned for Advance Mills, and this time they mean it. Brandon Shulleetta writes in the Progress that VDOT is proposing a $3M steel truss bridge to replace the existing bridge, which has been shut down for over a year because of its aged condition. VDOT had planned to build a bridge, cancelled their plans, planned to build a temporary one followed by a permanent one and then cancelled that. At this point, folks in Advance Mills just want a bridge, and don’t seem to particularly care about the details. This final (?) planned bridge is due to be finished by late next year or early 2010.
The city plans to hire an outside firm to conduct an efficiency study, Rachana Dixit writes in today’s Daily Progress. Though a firm hasn’t been selected, the university’s Weldon Cooper Center seems like a clear top candidate. The five-month study is intended to measure where Charlottesville can reduce the size and cost of government. Council has budgeted $50,000 for the study, which they hope will begin September 1.
Some nice pictures: Ghost signs of downtown (Via LoCoHistory) and Duncan Brown’s 1980 photos of the Downtown Mall. #
Recent Comments